Selective Bathroom Demolition in Sterling Heights, Michigan
For this Sterling Heights bathroom remodel, Demohaulic selectively removed the existing bathtub and tiled tub surround while preserving the rest of the bathroom. The upper drywall was also removed to about five inches below the ceiling to give the plumber access for a planned showerhead and diverter relocation. The homeowner planned to keep the vinyl bathroom floor, so it was protected throughout demolition.
- Selective bathroom demolition and bathtub removal
- Bathtub, tile surround and upper drywall removed to the agreed scope
- See the documented removal scope and photo record

Tub and Surround Removed, Bathroom Finishes Preserved
Demohaulic removed the bathtub and tiled surround, plus upper drywall to about five inches below the ceiling for the plumber’s planned showerhead and diverter relocation. The existing vinyl floor, window and surrounding finishes were kept.
- Location
- Sterling Heights, MI 48313 — Macomb County
- Date
- November 3, 2026
- Service
- Selective bathroom demolition and bathtub removal
- Primary work
- Bathtub, tile surround and upper drywall removed to the agreed scope
What Demohaulic Did
Demohaulic removed the bathtub and tiled tub-surround materials, then removed upper drywall to approximately five inches below the ceiling to provide access for the plumber’s planned showerhead and diverter relocation. The bathroom window, vinyl flooring and other finishes outside the agreed demolition scope were kept. The homeowner’s items and the walking path were moved or protected as needed for access; the newly tiled front porch and interior route received floor protection. The bathroom door was temporarily removed for access and reinstalled after the work.
- Removed the existing bathtub and tiled tub surround
- Removed upper drywall to about five inches below the ceiling for planned plumbing access
- Worked carefully around the existing bathroom window and sill
- Protected the existing vinyl flooring that was staying
- Protected the access route and newly tiled front porch
- Temporarily removed and later reinstalled the bathroom door
- Cleaned the work area and returned the moved belongings after demolition
The plumber handled the showerhead and diverter relocation. Demohaulic did not perform plumbing work, waterproofing or new tile installation.
Sterling Heights bathroom project, from protection through removal.
The photos show the bathroom before work, porch and interior-route protection, protected vinyl flooring, the tub-surround removal in progress, the exposed wall after removal and the before-and-after view.
Before

Property Protection




Demolition

After


Selective demolition complete. Ready for the plumber’s next step.
The tub, surround and upper drywall were removed to the agreed scope. The vinyl bathroom floor, window and surrounding finishes remained, and the route and bathroom were cleaned before the homeowner’s belongings were returned.
TEXT PHOTOS FOR A FAST ESTIMATE
Text photos of the bathroom, what should stay, the planned plumbing access and the carry route to 586-202-4056.