Selective Demolition in Utica, MI
For this October 2026 Utica bathroom project, the contractor’s goal was selective removal, not a full room gut. Demohaulic removed the bathtub and lower tile surround, keeping the upper wall sections and decorative marble pencil trim in place. About two inches of existing GoBoard remained below the trim for the tile contractor to incorporate into the next waterproofing and tile phase.
- Selective bathroom demolition
- Bathtub and lower tile surround removed; upper wall sections and marble pencil trim preserved
- See the documented removal scope and photo record

Selective Removal, With the Upper Tile Kept
Demohaulic removed the bathtub and lower tile surround while preserving the upper tile sections, decorative marble pencil trim and approximately two inches of existing GoBoard for the contractor’s next waterproofing and tile phase.
- Location
- Utica, MI 48317 — Macomb County
- Date
- October 30, 2026
- Service
- Selective bathroom demolition
- Primary work
- Bathtub and lower tile surround removed; upper wall sections and marble pencil trim preserved
What Demohaulic Did
Demohaulic carefully removed the existing bathtub and lower tile surround while preserving the upper wall sections and decorative marble pencil trim. Approximately two inches of existing GoBoard remained beneath the trim for the tile contractor to incorporate into the next phase of waterproofing and tile installation. Demohaulic’s work stopped at selective demolition and the documented handoff.
- Removed the existing bathtub
- Removed the lower tile surround below the retained upper section
- Preserved the upper wall tile and decorative marble pencil trim
- Left approximately two inches of existing GoBoard below the trim for the tile contractor’s next phase
Demohaulic did not perform waterproofing or tile installation; those were the contractor’s next phase. The next trade must handle any required plumbing or utility work.
Utica selective bathroom demolition, before and after.
The photos show the bathroom before demolition, the protected hallway route, the tub and lower surround removal, and the upper tile and marble pencil trim left in place.
Before

Property Protection

After

Selective Demolition

Before & After



Selective removal. A defined handoff for the tile contractor.
The bathtub and lower tile surround were removed, while the upper wall sections and decorative marble pencil trim remained. About two inches of existing GoBoard stayed below the trim for the tile contractor to incorporate into the next waterproofing and tile phase.