Verified project / Utica, MI 48317

Selective Demolition in Utica, MI

For this October 2026 Utica bathroom project, the contractor’s goal was selective removal, not a full room gut. Demohaulic removed the bathtub and lower tile surround, keeping the upper wall sections and decorative marble pencil trim in place. About two inches of existing GoBoard remained below the trim for the tile contractor to incorporate into the next waterproofing and tile phase.

  • Selective bathroom demolition
  • Bathtub and lower tile surround removed; upper wall sections and marble pencil trim preserved
  • See the documented removal scope and photo record
Utica bathtub and lower tile surround before removal alongside the exposed framing after selective demolition
Before & After, Utica Selective Bathroom Demolition
Project overview

Selective Removal, With the Upper Tile Kept

Demohaulic removed the bathtub and lower tile surround while preserving the upper tile sections, decorative marble pencil trim and approximately two inches of existing GoBoard for the contractor’s next waterproofing and tile phase.

Location
Utica, MI 48317 — Macomb County
Date
October 30, 2026
Service
Selective bathroom demolition
Primary work
Bathtub and lower tile surround removed; upper wall sections and marble pencil trim preserved
The scope

What Demohaulic Did

Demohaulic carefully removed the existing bathtub and lower tile surround while preserving the upper wall sections and decorative marble pencil trim. Approximately two inches of existing GoBoard remained beneath the trim for the tile contractor to incorporate into the next phase of waterproofing and tile installation. Demohaulic’s work stopped at selective demolition and the documented handoff.

  • Removed the existing bathtub
  • Removed the lower tile surround below the retained upper section
  • Preserved the upper wall tile and decorative marble pencil trim
  • Left approximately two inches of existing GoBoard below the trim for the tile contractor’s next phase

Demohaulic did not perform waterproofing or tile installation; those were the contractor’s next phase. The next trade must handle any required plumbing or utility work.

Photo record

Utica selective bathroom demolition, before and after.

The photos show the bathroom before demolition, the protected hallway route, the tub and lower surround removal, and the upper tile and marble pencil trim left in place.

Before

Bathroom with the tub and tiled surround intact before selective demolition
Before, Utica Bathroom

Property Protection

Floor protection laid along the bathroom access route
Protected Bathroom Access Route

After

Bathroom after removal of the bathtub and lower tile surround, with upper tile, window, and framing still in place
After, Tub and Lower Tile Surround Removed

Selective Demolition

Upper tile and decorative marble pencil trim left in place above exposed wall framing
Upper Tile and Marble Pencil Trim Preserved

Before & After

Bathtub and lower tiled surround before removal beside the selective demolition result
Before & After, Utica Bathroom
Bathroom floor edge before selective removal and framing exposed along the same edge afterward
Before & After, Utica Floor Edge
Lower tiled surround before removal and open wall framing below the retained upper tile afterward
Before & After, Utica Surround Removal
The result

Selective removal. A defined handoff for the tile contractor.

The bathtub and lower tile surround were removed, while the upper wall sections and decorative marble pencil trim remained. About two inches of existing GoBoard stayed below the trim for the tile contractor to incorporate into the next waterproofing and tile phase.

Need a selective bathroom demolition estimate?

TEXT PHOTOS FOR A FAST ESTIMATE

Text photos of the room, the surfaces that must stay and the access route to 586-202-4056.

TEXT PHOTOSCALL