Demolition & Junk Removal in Macomb, MI
A Macomb kitchen remodel called for a careful cabinet and countertop tear-out. The remodeling contractor prepared floor protection before Demohaulic arrived; we removed the upper cabinets first, then the countertops and lower cabinets, cleaned up and hauled away the removed material.
- Local job details tied to verified project photos
- Text photos and project ZIP for an estimate
- Service scopes confirmed before work begins
KITCHEN DEMOLITION — MACOMB, MI 48044
The remodeling contractor prepared the floor protection before Demohaulic arrived. Demohaulic carefully removed the upper cabinets, then the countertops and lower cabinets, cleaned up and hauled away the removed material. The contractor-prepared floor covering remained in place; the refrigerator shown was left in the kitchen.

The work that fits Macomb.
This verified Macomb job documents kitchen cabinet and countertop removal. Other demolition and hauling services can be scoped separately around the work and property.
The floor protection was prepared by the remodeling contractor, not Demohaulic. The refrigerator shown remained in place. Demohaulic does not perform plumbing, electrical or gas work, installation or reconstruction.
How Demohaulic Works
A kitchen tear-out starts with a clear list of what comes out, what stays and which trade prepared the surrounding surfaces.
Confirm the removal line
Identify which cabinets and counters come out, what stays in place and which appliances or fixtures remain.
Coordinate the protection and trade handoff
Confirm which contractor-prepared protection is already in place and who handles any required utility disconnects.
Remove in a deliberate sequence
For this project, upper cabinets came down first, followed by the countertops and lower cabinets.
Clean up and haul away
The removed material was cleaned up and hauled away, leaving the documented kitchen ready for the next phase.
Planning a Macomb kitchen tear-out?
Text clear photos of the cabinets, countertops, appliances, contractor-prepared protection and carry route. Identify which items stay, who is responsible for utility disconnects, and whether debris haul-away is included.
The floor protection was prepared by the remodeling contractor, not Demohaulic. The refrigerator shown remained in place. Demohaulic does not perform plumbing, electrical or gas work, installation or reconstruction.
Macomb demolition and hauling FAQs
Details from the documented Macomb kitchen removal and practical boundaries for a new remodel-prep request.
What did Demohaulic remove in the Macomb kitchen?
The verified project included the upper cabinets, countertops and lower cabinets. The kitchen was cleaned up and the removed material was hauled away.
Who prepared the floor protection?
The remodeling contractor prepared the protective floor covering before Demohaulic arrived. Demohaulic did not install it.
Did Demohaulic install the new kitchen or modify utilities?
No installation or reconstruction is claimed. Demohaulic performed the documented removal, cleanup and haul-away; required utility disconnects must be handled by the owner or appropriate licensed trade.
What happened to the refrigerator?
The refrigerator shown in the after photos remained in the kitchen and was not part of the removal scope.
TEXT PHOTOS FOR A FAST ESTIMATE
Text kitchen photos and the carry route to 586-202-4056 for an estimate, or use Request an Estimate to describe the removal scope.