Bathroom Demolition in Bloomfield Hills, MI
Selective bathroom remodel prep: the sink and vanity, toilet, tiled floor and mortar-bed assembly were removed. The floor stopped at the plywood subfloor; bagged debris was carried out and staged in front of the garage.
Remove the approved layers.
This selective bathroom demolition prepared the space for the next phase of the remodel. The work stayed within the approved fixture and floor-removal scope.
- Location
- Bloomfield Hills, MI
- Service
- Bathroom demolition / tile-floor assembly removal
- Primary work
- Sink, vanity and toilet removal; tiled mud-set floor removal down to plywood subfloor
Fixture removal and floor prep.
The bathroom sink and vanity were removed, followed by the toilet and the existing tiled floor assembly. Removal continued through the mud-set/mortar-bed layer, metal lath and felt paper to the plywood subfloor.
- Sink and vanity removed
- Toilet removed
- Tile, mortar bed, metal lath and felt paper removed
- Floor taken down to the plywood subfloor
- Debris bagged, carried out and staged in front of the garage
No shower demolition, plumbing, electrical, structural work or off-site debris disposal is represented on this page.
The floor assembly, step by step.
These two photos show different points in the documented demolition, not a manufactured before-and-after pair.